Questions |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Technical information to prepare a quotation: |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Answers |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Medium and analysis The rubber of the AMEX-10 seal is produced in accordance with the pipe the medium. For pipelines carrying potable- or sewer water we use EPDM. In gas we use a special developed NBR. For other medium, especially for aggressive liquids, we require a chemical analysis. Based on such information we select the ideal material for the seals. Material of pipe/when built For the price calcutaltion and the site preparation we require information about the pipe material and age of the pipe. In general all pipes can be rehabilitated by the AMEX-10 system. Internal diameter/ length between joints In order to enable us to work out a quotation and to produce the seals we require the exact internal diameter in the joint area with an indication of maximum possible tolerances. We also have to know the distance between joints. Working pressure (outside- and internal pressure) We require the maximum working pressure of the pipe. Is the pipe confronted with infiltrating ground water, we require the maximum outside pressure. Type of joint We require the maximum width and depth of the joint. If possible, please let us have a cross section drawing of the joint. This is just required for work preparation, in general the AMEX-10 system seals any joint. Place/Country In order to chose the correct seal profile it is important to know whether the seal will be possibly installed in an area endangered by earthquakes, an area with strong setting properties or with rising groundwater.. Condition of pipe: pollution, corrosion Information about the condition of the pipe in the joint area: wallthickness, corrosion, pitting, pollution, solid/loose sediments. Indication whether the corrosion can be brushed off or whether it has to be grinded. Rehabilitation lengths (distance between access) The length between access of the pipe to be rehabilitated depends on the diameter of the pipe. Your pipenet plan will help to work out the optimum lengths. Required time for rehabilitation Above information is necessary to organize the site, to work out a realistic offer and to calculate the required time for rehabilitation as accurate as possible. Frequently asked questions related to the AMEX-10 system
|
